Advanced Rail Crossing Functional Area

Description

Field elements at highway-rail intersections (HRIs) where operational requirements demand advanced features (e.g., where rail operational speeds are greater than 80 miles per hour). Capabilities from the Standard Rail Crossing plus systems which preclude entrance into the intersection when the barriers are activated, additional arriving train information, and detection of blocked intersections.

Included In

Private Rail Operations Active Warning Roadside Equipment

Functional Requirements

IDRequirement
1The field element shall collect and process, traffic sensor data in the vicinity of a highway-rail intersection (HRI).
2The field element shall determine whether the highway-rail intersection (HRI) is blocked by traffic in the roadway or some other obstruction.
3The field element shall notify the traffic management center and the rail wayside equipment of any intersection blockages, including trapped vehicles or other obstructions.
4The field element shall monitor the status of the highway-rail intersection (HRI) equipment, including both the current state and mode of operation and the current equipment condition, to be forwarded on to the traffic management center.
5The field element shall monitor the status of the highway-rail intersection (HRI) equipment, including both the current state and mode of operation and the current equipment condition, to be forwarded on to the rail wayside equipment.
6The field element shall receive track status and arriving train information from the rail wayside equipment that can be passed on to the traffic management center. This may include the current status of the tracks and when a train is expected and/or how long the crossing will be closed.
7The field element shall collect pedestrian images and pedestrian sensor data, and respond to pedestrian crossing requests via display, audio signal, or other manner.
8The field element shall control the dynamic message signs (DMS) in the vicinity of a highway-rail intersection (HRI) to advise drivers, cyclists, and pedestrians of approaching trains.
9The field element shall close the highway-rail intersection (HRI) when a train is approaching with enough time for traffic to safely clear the crossing using gates, lights/signs, barriers, and traffic control signals.
10The field element shall support the integrated control of adjacent traffic signals to clear an area in advance of an approaching train and to manage traffic around the intersection.
11The field element shall forward rail traffic advisories received from the Wayside Equipment to the traffic management center.
12The field element shall provide approaching train advisories using field-vehicle communications to vehicles approaching the grade crossing.